Skip to main content
AceWattAceWattStart free trial

The AI CRM for Electrical Contractors

Walk the job, get an itemized quote draft, schedule the crew, and invoice the customer from the same record.

or watch the 5-minute demo

  • 14-day free trial
  • Plans from $49/month
  • 30-day money-back guarantee
AceWatt dashboard for a demo electrical contractor showing active jobs, open quotes, outstanding invoices, monthly revenue, and quick actions for a new estimate, an AI job walk, time, an invoice, and a project
Screens from a demo company with sample data.

How it works

From first call to paid invoice, on one record

Six real screens from the app. Step through them in order, or jump to the part you care about.

Capture the lead

Add the customer once. The lead pipeline shows every open opportunity from cold lead to closed won, with follow-ups and pipeline value on the same screen.

Learn more about the CRM for electricians
AceWatt customers view with total customers, pipeline value, follow-ups, and a lead pipeline from cold to closed won

Step 1 of 6

Want to click around yourself?

Features

The four jobs it does every day

Estimating, job walks, scheduling, and invoicing, built for electrical work and linked to the same customer and job.

  • An AceWatt quote for a 12-pole parking lot LED retrofit with line items for LED area lights, a bucket truck rental, journeyman and apprentice labor, and fixture disposal

    Estimating and quotes

    Draft itemized quotes from a job walk, photos, a description, or PDF plans, then review and send. Accepted quotes carry their line items into the invoice.

    Learn more
  • AceWatt AI Job Walk start screen: walk the site with your camera and voice while AI notes equipment, materials, measurements, and safety concerns, optionally linked to a project

    AI Job Walk

    Walk the site with voice and camera. Notes on equipment, materials, measurements, and safety concerns land on the job.

    Learn more
  • AceWatt calendar for September 2026 with scheduled electrical jobs on the month view and a list of upcoming events

    Scheduling and dispatch

    Calendar, drag-and-drop dispatch, and a live crew map. GPS clock-in flags whether a tech is on the job site.

    Learn more
  • An AceWatt invoice for a dental office tenant improvement with electrical line items including EMT equipment circuits, LED flat-panel troffers, a Square D QO 200A panel, and lighting controls

    Invoicing and payments

    Invoices with the quote's line items, deposits on acceptance, milestone billing, and overdue reminders by email.

    Learn more

Scheduling

What is the best electrical contractor scheduling app?

For most electrical shops, the best scheduling app is one built around the trade. AceWatt pairs a dispatch board and calendar with an AI schedule optimizer and an electrical pricebook, at published pricing of $49–$199/month with a 14-day trial and no sales call. Generic field-service tools like Jobber and Housecall Pro schedule well but treat electrical work like any other trade, while ServiceTitan targets 20+ tech enterprise operations at quote-only pricing.

Reported pricing, compiled September 2026
AppBest forPricingSchedulingElectrical-specific
AceWattElectrical contractors, 1–25 techs$49–$199/mo, publishedDispatch board, calendar, AI schedule optimizer (Growth+)Yes: electrical pricebook, trade-specific AI
JobberGeneral home service, 1–10 techs~$69–$349/mo (reported)Calendar, dispatch, route planningNo, generic trade
Housecall ProResidential service, up to 8 users/tier~$149–$189/mo + per-message SMS fees (reported)Calendar, dispatch board, on-the-way textsNo, generic trade
ServiceTitanEnterprise multi-trade, 20+ techsQuote-only (reported $250–$500+/tech/mo)Full dispatch, capacity planningPartial, multi-trade enterprise
FieldPulseService businesses needing invoicing depth~$89/mo base, sales call required (reported)Calendar, job schedulingPartial

Competitor pricing comes from public pages and reported figures, compiled September 2026, and may change. Confirm with each vendor. Deeper breakdowns: contractor scheduling software and our comparison guides.

Pricing

Simple plans, published prices

Every plan starts with a 14-day free trial. Your first payment is covered by a 30-day money-back guarantee.

  • Starter

    Perfect for solo electricians and small shops getting organized.

    $49/month

    1 user

    • Core CRM (jobs, quotes, invoices, scheduling)
    • AI quote builder
    • Basic dispatch & calendar
    • Email support
    Start free trial
  • Recommended

    Growth

    For growing teams that need AI-assisted workflows and visibility. Includes everything in Starter.

    $99/month

    Up to 5 users

    • AI copilot & voice
    • AI schedule optimizer
    • AI document scanner
    • AI job walk (voice + photos)
    Start free trial
  • Scale

    For established shops with unlimited users, route optimization, and a dedicated support contact. Includes everything in Growth.

    $199/month

    Unlimited users

    • Custom webhooks
    • Route optimization
    • Advanced reports & analytics
    • Dedicated support contact
    Start free trial

14-day free trial on every plan. 30-day money-back guarantee on your first subscription payment.

Compare plans

FAQ

Questions electrical contractors ask

What is AceWatt CRM?

AceWatt CRM is an AI-powered customer relationship management web app built specifically for electrical contractors. It handles customers and leads, estimates and quotes, scheduling and dispatch, job walks, invoicing with online payment, and email communication. The AI drafts estimates, job-walk notes, and summaries that you review before anything reaches a customer.

Is AceWatt designed for electrical contractors?

Yes. AceWatt is built for the electrical trade, with an electrical pricebook, trade-specific workflows, and AI that understands electrical terminology.

How does the AI voice assistant work?

There are two voice features. The AI Job Walk (Growth plan and up) lets you talk through a site visit and take photos, and AceWatt turns that into job notes and scope for the estimate. The AI Assistant (Growth plan and up, admin users) answers quick questions by chat or voice from a summary of your recent customers, quotes, invoices, and projects. Voice does not create or send quotes on its own; you review every draft before it goes out.

What are AI agents?

AceWatt's AI Assistant is a business Q&A chat. Ask quick questions about your business in plain English; the AI Assistant answers from a summary of your recent customers, quotes, invoices, and projects. AI also drafts estimates for your review and turns job-walk notes and photos into a report, and the contractor reviews and approves before anything goes to a customer.

Can I import my existing customer data?

Yes. AceWatt imports customers from a CSV file, so you can move over from spreadsheets or another tool. If you get stuck, email support@acewatt.com and we will help you map the columns.

Does it work on mobile devices?

Yes. AceWatt is a web app that installs on any phone or tablet from the browser, so there is nothing to download from an app store. Crews get GPS clock-in, photo uploads, the AI Job Walk with voice and camera, and a limited offline queue that syncs when signal returns. Customers accept quotes and pay invoices from public links that work on any device.

How does the trial signup work?

Start a 14-day free trial from acewatt.com/start-trial and choose the plan you want to test. There is no permanent free tier. Plans start at $49 per month, and your first subscription payment is covered by a 30-day money-back guarantee.

How does the AI help my business?

AceWatt's AI drafts estimates from a job walk, photos, a written description, or PDF plans, with line items you review. It turns voice and photos from a site walk into job notes and scope, scans and classifies documents, suggests a crew schedule, drafts email campaigns, answers quick questions from a summary of your recent records, turns a plain-English question into the matching report (revenue, quote conversion, aging, labor hours, job profitability or P&L), and gives you a morning briefing dashboard of what needs attention. Overdue invoices get automatic email reminders at 1, 7, 14, and 30 days. Pricing, code, and safety decisions stay with you.

What is the best scheduling app for electrical contractors?

For electrical-specific shops, AceWatt combines a dispatch board, calendar, and AI schedule optimizer with an electrical pricebook at $49-$199/month with published pricing and a 14-day trial. Generalist tools like Jobber (~$69-$349/month reported) and Housecall Pro (~$149-$189/month plus per-message SMS fees, reported) schedule well but are not built around the electrical trade, and ServiceTitan serves 20+ tech enterprise operations at quote-only pricing.

From the founder

“Built around electrical workflows that generic CRMs often miss: conduit, panels, permits, estimates, and field-to-office handoffs.”

Manvel “Mike” Beyleyan, Founder & Board Member, AceWatt

Read the founder story

See AceWatt on your own jobs

Start a 14-day free trial, or watch a 5-minute walkthrough of the app first.